    Default excavator hammer top plate

    Customer bought a hammer for his excavator to help him keep working with the heavy frost. Pin location needed to be modified to fit his quick coupler. This pc. has been modified at least once before. It had extra bushings with it also.

    What I did was measure the difference I needed in pin centers & cut out the one location off center. Flipped pcs around & left to right. This moved the centers to where I needed them. He gave me 2.25" hot rolled bar to use for pins & the bushings were 60 mm (2.359"). So I wrapped the pins where they go through the bushings with .050" sheet. This gave me a tight fit. I also had to make up 3/8" spacers on each inside to shrink it 3/4" total to fit tightly side to side. Welded everything solid as per customer.

    0131041848.jpg
    0131041849.jpg
    0203042046.jpg
    0203042047.jpg
    Last edited by MMW; 02-07-2014 at 07:34 AM.
    MM250
    Trailblazer 250g
    22a feeder
    Lincoln ac/dc 225
    Victor O/A
    MM200 black face
    Whitney 30 ton hydraulic punch
    Lown 1/8x 36" power roller
    Arco roto-phase model M
    Vectrax 7x12 band saw
    Miller spectrum 875
    30a spoolgun w/wc-24
    Syncrowave 250
    RCCS-14

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Warning: Function split() is deprecated in /mnt/stor3-wc1-dfw1/357822/357839/www.millerwelds.com/web/content/lib/footer.inc.php on line 82

Welding Projects

Special Offers: See the latest Miller deals and promotions.