My boss wants to get new receptacles (4) for the premises, we are a garden co-op apts and by law we need them. We were looking at catalog but the price of this receptacles are way to high, about a $1200.00 ea plus shipping. If he buys the materials how much I can charge him for the fabrication/labor?. I own a Miller Maxtar 140 SRT and a Hobart 135 handler with a 75-25 mix bottle.
Option #1
Option #2
![]()
Results 1 to 10 of 11
Thread: Trash Can receptacles
-
04-17-2012, 07:30 PM #1
Junior Member
- Join Date
- Mar 2011
- Posts
- 19
Trash Can receptacles
-
04-17-2012, 10:41 PM #2
400
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts
-
04-22-2012, 05:58 AM #3
You can charge him whatever your time & material are worth. Figure out how long it will take you to make them, then multiply it by an hourly rate you are comfortable with. Add your labor plus material cost plus markup together plus paint or powder coating cost.
If you are using existing trash cans make sure they fit. If you are supplying cans make sure you can buy new ones to fit in the future as replacements.MM250
Trailblazer 250g
22a feeder
Lincoln ac/dc 225
Victor O/A
MM200 black face
Whitney 30 ton hydraulic punch
Lown 1/8x 36" power roller
Arco roto-phase model M
Vectrax 7x12 band saw
Miller spectrum 875
30a spoolgun w/wc-24
Syncrowave 250
RCCS-14
-
04-22-2012, 07:11 PM #4
Junior Member
- Join Date
- Jan 2009
- Posts
- 14
Figure out what you think you can do it for and double that amount.
-
04-22-2012, 09:46 PM #5
seriously those are 1200 dollars? man i need to get into the trash can bussiness, thats some easy money!!!! yeah these guys have good advice, just calculate matierals and what you want an hour and figure from there. And honestly, if they were askin 1200 for those, id just tell them ill do it for half that a piece, youd still make some killer coin from that job.
Last edited by spence648; 04-22-2012 at 09:48 PM.
-
04-23-2012, 06:52 AM #6
Senior Member
- Join Date
- Sep 2005
- Location
- 16919 Pole Rd. Brethren, MI 49619
- Posts
- 4,248
Why would you price it at half?
-
04-23-2012, 06:55 AM #7
Senior Member
- Join Date
- Sep 2005
- Location
- 16919 Pole Rd. Brethren, MI 49619
- Posts
- 4,248
Why would you price it at half? You already know the competitors price, it doesnt get any easier than that.
-
04-23-2012, 01:19 PM #8
you have a good point but i guess to just make boss happy and make him feel like hes getting a deal, you telling me you wouldnt build one of those for 600 a piece?
-
04-23-2012, 04:23 PM #9
Senior Member
- Join Date
- Sep 2005
- Location
- 16919 Pole Rd. Brethren, MI 49619
- Posts
- 4,248
You could get a grand and still give a deal while not leaving 400 on the table for the same work. Paint adds a lot of time and cost. You have to buy the materials out of this "600", the margins would disappear in a hurry and knowing the retail price is a gift, almost handed the cost to a guy with no estimating work.
And no,,, I would not build it for 600,,, especially when I know they cost 1200wouldn'tdn even need to know anything about fabrication, basic logic.Last edited by Sberry; 04-23-2012 at 04:28 PM.
-
04-26-2012, 08:16 AM #10
Junior Member
- Join Date
- Mar 2011
- Posts
- 19
Check this link:
http://www.kitchensource.com/trash/wt-m36-sq-gft.htm



Reply With Quote








