Anyone have a lot of time in a project and cannot charge for the time you have in it? I have a little more than 30 hours in this up grade. A fellow wanted lift assist ramps built on this gooseneck, he had to slide them out from the rear and manually set in place but it tool me a lot of time engineering the best way and some trial and error. Plus I have a couple hours of mill and lathe work but I don't think I can charge him more than $350-$400 for such a job. Any thoughts?? Have this happened to you and how do you handle it? Here are a couple pics. I like the final design, turned out well.
Results 1 to 10 of 25
Thread: Lotta time, little $$
Threaded View
-
02-22-2008, 05:45 PM #1
Member
- Join Date
- Feb 2007
- Location
- Blissfield, MI
- Posts
- 78
Lotta time, little $$
Modern Metalworking L.L.C
Blissfiled, MI
517-605-9481
Miller Dynasty 350 Tig runner
Hobart 3-phase mig
Hypertherm 1000 plasma
Mill
Lathe
Box break
Shear


Reply With Quote







