Miller Electric

Welding Discussion Forums

Home » Resources » Communities » Welding Discussion Forums
 
Miller Welding Discussion Forums - Powered by vBulletin

Results 1 to 3 of 3

Thread: Change?

  1. #1
    Join Date
    Oct 2007
    Location
    Indiana
    Posts
    541

    Default Change?

    When is the change over going to happen?
    Tim Beeker,
    T-N-J Industries
    (my side bussiness)

    Miller Synchrowave 350LX with tigrunner
    Esab 450i with wire feeder
    HH135 mig
    Thermal Dynamics cutmaster 51 plasma cutter
    Miller aircrafter 330 - sold
    Marathon 315mm coldsaw
    vertical and horizontal band saws
    table saw
    Dewalt cut off saw
    Sand blast cabinet
    lots of hand grinders
    Harris torch
    beer fridge

  2. #2
    Join Date
    Nov 2007
    Location
    West Georgia
    Posts
    103

    Default I think the hint is in the sticky message

    System downtime, morning of Monday the 28. That's my guess.
    Last edited by EdZep; 01-25-2008 at 09:09 PM.

  3. #3
    Join Date
    Oct 2007
    Location
    Indiana
    Posts
    541

    Default

    Yep, good point.
    Tim Beeker,
    T-N-J Industries
    (my side bussiness)

    Miller Synchrowave 350LX with tigrunner
    Esab 450i with wire feeder
    HH135 mig
    Thermal Dynamics cutmaster 51 plasma cutter
    Miller aircrafter 330 - sold
    Marathon 315mm coldsaw
    vertical and horizontal band saws
    table saw
    Dewalt cut off saw
    Sand blast cabinet
    lots of hand grinders
    Harris torch
    beer fridge

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Warning: Function split() is deprecated in /mnt/stor3-wc1-dfw1/357822/357839/www.millerwelds.com/web/content/lib/footer.inc.php on line 82

Welding Projects

Special Offers: See the latest Miller deals and promotions.