    I've been Jonesing to break out the welding station again and tick off the neighbors with the grinders. So I got to work on the semi-privacy gates between my house and my neighbors. When I bought the place, there was only chainlink fencing. That stuff is an abomination in my opinion. So I got a load of tubing and got started.

    My design is a frame of 2" tubing. Originally, that tubing was 11 gauge. That idea quickly changed to 16 gauge. I like using 4" for posts too even though that's probably overkill. It just looks cool.

    Since I like incorporating wood and metal together in my projects, I decided to use angle iron for mounting some finished cedar with carriage bolts.

    I also thought if you were going to make something that looks like a few thousand bucks, why use that cheesy Stanley gate hardware? My hinges are barrel hinges that are a double design so that the gate fully opens, but I had to connect them to keep them from acting independently. The door locks are mortised storm door locks.

    They function like someone who knows what they are doing made them. I don't know what went wrong. Ha! I'm happy with them.
    Attached Images Attached Images
    MillerMatic 252
    Spoolmate 200
    Diversion 165
    Spectrum 625 X-Treme
    Dayton 6" Miter Band Saw
    Delta Drill Press
    Bosch 10" Table Saw
    Bosch 12" Double Bevel Miter Saw
    Jet 5 Ton Chain Hoist
    Radnor O/A

    and this heavy duty table I made


  2. #2
    Join Date
    Apr 2010
    Location
    Jackson, MS
    Posts
    79

    Default

    Oh yeah, I also had to make post caps and notch one of the posts so that a gas line on the neighbor's house could pass through. The notch was a little bit of a challenge, but I got to use my new die grinder a bunch with this project.

    I'm pretty amazed at you pros. This may have taken you guys a day or two, but it took me probably about 10 days. Welding is hard but fun.
    Attached Images Attached Images
    MillerMatic 252
    Spoolmate 200
    Diversion 165
    Spectrum 625 X-Treme
    Dayton 6" Miter Band Saw
    Delta Drill Press
    Bosch 10" Table Saw
    Bosch 12" Double Bevel Miter Saw
    Jet 5 Ton Chain Hoist
    Radnor O/A

    and this heavy duty table I made


  3. #3
    Join Date
    Apr 2011
    Posts
    360

    Default Wow...

    ...that turned out nice...care to divulge a material list/cost?

  4. #4
    Join Date
    Apr 2010
    Location
    Jackson, MS
    Posts
    79

    Default

    I'm terrible about saving receipts. But I think they cost between $300 - $400 each by the time you add in grind and buffing wheels, paint, concrete, hardware, etc. Part of my problem is I don't have a way to get the 20' sticks to my house without killing someone on the highway. There ends up being a lot of scrap left over (for other projects) when I get it cut down in half for transport.

    They are 75" x 72" and 65" x 74". There are 12" spacing between the top and bottom. The brackets for the wood are 1 1/4" angle with one side cut to 1" and the risers are 1" square tube x 1/2". That makes for 1/2" spacing between the boards and frame.
    MillerMatic 252
    Spoolmate 200
    Diversion 165
    Spectrum 625 X-Treme
    Dayton 6" Miter Band Saw
    Delta Drill Press
    Bosch 10" Table Saw
    Bosch 12" Double Bevel Miter Saw
    Jet 5 Ton Chain Hoist
    Radnor O/A

    and this heavy duty table I made


  5. #5
    Join Date
    May 2011
    Location
    Bossier Parish La.
    Posts
    544

    Smile Another Sugestion?

    If you have to get your material cut in half for safe transport, why not consider for your next project to build a rack for the back of your truck? That was one of the first projects I made after buying my welder. This allows you to carry 20' sticks(properly secured) without towing a trailer. It may be removed when not needed. This cuts down on scrap pieces left over and reduces overall project costs. If needed buy an extra piece or two for other small projects that come up.
    By the way those gates do look nice, I wish I had a place in my yard that needed a set like that. Then I could make a similar set from those pics. On second thought there may be a place I could put some like that if I can catch-up on the other projects on the TO-DO list.

  6. #6
    Join Date
    May 2011
    Location
    Bossier Parish La.
    Posts
    544

    Default Truck Rack

    If you decide to make a truck rack to haul material on, one main point I suggest is to make the front bar extend past the roof sheet metal of the cab. Otherwise you can get wind noise that increases with speed. Either from flutter of the sheet metal or just wind buffeting. I borrowed a rack from a neighbor to go get the material for my rack, and it was made for a standard cab, mine is extended cab. The roof vibrated so bad at highway speeds the radio couldn't drown it out. I drove two different trucks, same model, rack built by the same man, one with the rack close to the cab(with in 1"), one farther up(at least 4"), both terminated just behind the roof/windsheild point. Both created wind noise even though the front bar was installed 45 degrees to the wind, not with a flat side forward. Mine has the flat side to the wind but it is out over the glass and does not make wind noise. Make sure to build it with this in mind or else invest in a REAL POWERFUL audio system or hearing protection,maybe both. Also a rack is a good option because it needs no registration, no lights, no extra insurance. The only maintenance is a good coat of paint every few years, mine is due for one now and it was painted in Sept 2001.
    Last edited by Bistineau; 05-11-2011 at 06:39 PM.

  7. #7
    Join Date
    Feb 2012
    Location
    illinois
    Posts
    12

    Default frame

    What gauge steel did you use for the frame?

  8. #8
    Join Date
    Oct 2007
    Location
    Cave Creek Az
    Posts
    969

    Default

    You did a nice job. I hate to burst your bubble a little, however, if I couldn't turn out that gate in less than 6 hours I wouldn't make money at it. Granted, I make a lot of gates, have all of the supplies on hand, and get better prices on steel than you do. I don't even really make gates unless they are hand forged pieces any more. The only gates i do are more as favors for the contractors who buy a lot of ironwork from me.

  9. #9
    Join Date
    Jul 2011
    Location
    Tampa FL USA 33617
    Posts
    17

    Default

    Quote Originally Posted by walker View Post
    You did a nice job. I hate to burst your bubble a little, however, if I couldn't turn out that gate in less than 6 hours I wouldn't make money at it. Granted, I make a lot of gates, have all of the supplies on hand, and get better prices on steel than you do. I don't even really make gates unless they are hand forged pieces any more. The only gates i do are more as favors for the contractors who buy a lot of ironwork from me.
    Great one up story..Im sure that just made his day...got any more dirt you want to kick in his face?

  10. #10
    Join Date
    Jul 2011
    Location
    Tampa FL USA 33617
    Posts
    17

    Default

    oh and I think it turned out great...Keep up the good work!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Warning: Non-static method PhpQuickProfiler::getMicroTime() should not be called statically in /mnt/stor3-wc1-dfw1/357822/357839/www.millerwelds.com/web/content/lib/pqp/classes/Console.php on line 77

Warning: Non-static method PhpQuickProfiler::getMicroTime() should not be called statically in /mnt/stor3-wc1-dfw1/357822/357839/www.millerwelds.com/web/content/lib/pqp/classes/Console.php on line 77

Warning: Non-static method PhpQuickProfiler::getMicroTime() should not be called statically in /mnt/stor3-wc1-dfw1/357822/357839/www.millerwelds.com/web/content/lib/pqp/classes/Console.php on line 77

Warning: Non-static method PhpQuickProfiler::getMicroTime() should not be called statically in /mnt/stor3-wc1-dfw1/357822/357839/www.millerwelds.com/web/content/lib/pqp/classes/Console.php on line 77

Warning: Non-static method PhpQuickProfiler::getMicroTime() should not be called statically in /mnt/stor3-wc1-dfw1/357822/357839/www.millerwelds.com/web/content/lib/pqp/classes/Console.php on line 77

Warning: Non-static method PhpQuickProfiler::getMicroTime() should not be called statically in /mnt/stor3-wc1-dfw1/357822/357839/www.millerwelds.com/web/content/lib/pqp/classes/Console.php on line 77

Warning: Non-static method PhpQuickProfiler::getMicroTime() should not be called statically in /mnt/stor3-wc1-dfw1/357822/357839/www.millerwelds.com/web/content/lib/pqp/classes/Console.php on line 77

Warning: Function split() is deprecated in /mnt/stor3-wc1-dfw1/357822/357839/www.millerwelds.com/web/content/lib/footer.inc.php on line 82

Welding Projects

Special Offers: See the latest Miller deals and promotions.