    Default Accumulator Erosion

    A 15 year old carbon steel industrial hot-water accumulator (4000 gallon capacity) that my company is consulting on, is suffering from premature erosion opposite a water inlet nozzle.

    The plan is to build up the SA 516-70 carbon steel shell (1.25" thick) with a two-layer patch of austenitic stainless steel weld cladding

    Layer one will be welded with 309L and layer two will be welded with 308L filler metal. The area of the patch will be approx. 9 sq. ft. The patch will be applied on a vertical wall.

    Do you have any ideas for process options or procedures?

    Thanks

    Ryan

  2. #2
    Join Date
    Jan 2009
    Location
    SW Ohio
    Posts
    135

    Default

    Quote Originally Posted by RyanMAN View Post
    The plan is to build up the SA 516-70 carbon steel shell (1.25" thick) with a two-layer patch of austenitic stainless steel weld cladding
    Ryan
    Using stainless for the patch will increase the rate of corrosion on the rest on the shell. The galvanic potential between carbon steel and austenitic stainless is not great, but there is a difference.

    http://www.eaa1000.av.org/technicl/c...n/galvanic.htm

    Since water is present, you certainly have an electrolyte, and higher temperatures only accelerate the corrosion process.

    I would recommend matching the shell material and filler as closely as possible.

    -jim
    Dynasty 300DX
    MM350P
    Hobart Handler 120
    Smith LW7, MW1, AW1
    Smith AR/He Mixer

  3. #3
    Join Date
    Sep 2005
    Location
    northern NJ
    Posts
    1,856

    Default

    Add a baffle or diverter at the inlet so it will not point directly at the opposite wall.

    As for the repair area I would patch or build up the area with the same material as the tank.
    MM250
    Trailblazer 250g
    22a feeder
    Lincoln ac/dc 225
    Victor O/A
    MM200 black face
    Whitney 30 ton hydraulic punch
    Lown 1/8x 36" power roller
    Arco roto-phase model M
    Vectrax 7x12 band saw
    Miller spectrum 875
    30a spoolgun w/wc-24
    Syncrowave 250
    RCCS-14

  4. #4
    Join Date
    Apr 2011
    Posts
    3

    Default

    thanks for you input, any suggestions for the process that should be used?
    The welding has to be performed in side the tank and can only be accessed by a small hatch.

  5. #5
    Join Date
    Dec 2009
    Location
    Williams Lake, British Columbia
    Posts
    722

    Default

    Automatic welding machines. You can rent them. But I would suggest taking to your local Boiler makers union they will know exactely what to do. I've seen these machine put a coat of stainless on top of old stainless pipe, it's the perfect set-up.
    But it doesn't come cheap at $250 000 a day.

  6. #6

    Default

    How large is the tank?
    I would start with an ultrasound test to see if the tank is worth repairing since it is 15 years old.

    The ultrasound test can give you valuable info.
    Or cut the patch out and do a visual inspection before deciding on the repair or repair procedure.

    Also you did not say, but is the tank under pressure?

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Warning: Function split() is deprecated in /mnt/stor3-wc1-dfw1/357822/357839/www.millerwelds.com/web/content/lib/footer.inc.php on line 82

Welding Projects

Special Offers: See the latest Miller deals and promotions.