    Thanks for the input guys.

    Gate is done.

    I think it will hold fine but wouldn't have done as much without the suggestions.

    It looks a tad bit higher on one end. It is. The column where the main post went wasn't plum so had to tilt the post back a little so things would look the same. Could probably adjust the hinges and bring it down but the owner said leave her be, he was happy with it.

    Thanks.
    Attached Images Attached Images

  2. #12
    Join Date
    Feb 2007
    Location
    Near Dallas, TX
    Posts
    214

    Default

    I never like to hang a gate on a single pole. I like to install another pole 8 to 10 feet down the fence and strongly brace the gate pole to this other pole. This way for the gate to sag it has to pull the other pole straight up out of the ground. If you plan on leaving the gate open for extended amounts of time. I would brace it 90 degrees to the fence, or put in a short post for the gate to rest on when open.

    I like to fill the holes totally full of concrete, then finish the top to look pretty and be flush with ground level. This way the grass can't grow directly around the pole. You can mow over the edge of the concrete and be done without breaking out the weedeater.

    Dynasty200DX w/coolmate1
    MM210
    MM Vintage
    Lincoln AC225
    Victor O/A, Smith AW1A
    Cutmaster 81
    IR 2475N7.5FP
    Evolution Rage3
    Jancy USA101
    9" South Bend
    AEAD-200LE

  3. #13
    Join Date
    Sep 2006
    Location
    Abilene, Texas
    Posts
    639

    Default

    I'm sure that it depends on the soil types, but I'm a lot like Andy. Even if you brace the post back 2 or 3 feet, it will be a lot stronger than just a single post. Granted, if you are in granite, it's not going to be necessary. I normally set a post about 6 feet from the gate post and brace to it. I go 4 feet deep and set concrete to the top of the ground with both posts. I've not had issues with the gates sagging. For barbed wire fences, I set a short 3rd post about 6 feet from the brace post and brace to it also. All are 4 feet deep filled with concrete. In my area, this works well.
    Jim

  4. #14
    Join Date
    Sep 2009
    Location
    South Carolina
    Posts
    570

    Default

    Good reading guys

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Warning: Function split() is deprecated in /mnt/stor3-wc1-dfw1/357822/357839/www.millerwelds.com/web/content/lib/footer.inc.php on line 82

Welding Projects

Special Offers: See the latest Miller deals and promotions.