Results 11 to 14 of 14
Thread: Stair Railing
-
03-22-2010, 06:32 AM #11
MM250
Trailblazer 250g
22a feeder
Lincoln ac/dc 225
Victor O/A
MM200 black face
Whitney 30 ton hydraulic punch
Lown 1/8x 36" power roller
Arco roto-phase model M
Vectrax 7x12 band saw
Miller spectrum 875
30a spoolgun w/wc-24
Syncrowave 250
RCCS-14
-
03-22-2010, 04:52 PM #12
Member
- Join Date
- Nov 2009
- Location
- Central Arkansas
- Posts
- 46
Thanks for the comments everyone, yes Bodybagger, even you!

The rails are 1 1/4" sq with 1 9/16" cap rail. From the best we could tell, the avg. aggregate size was about 1/4" for the precast steps. We are 2" +- from the edge and epoxy was put on the anchors. As for the total ADA compliance, the building went with nothing for over 70 years. People are just glad to have something to grab onto.
I do my best to do it right, but sometime regs can be confusing has h3ll. I have done work in 3 cities close to me and none have identical regs.Rick
Trying to succeed, Learning by failing
HH210 (Merry Christmas to Me)
HH 140
Hyper Therm Powermax 600
Hobart Stickmate AC/DC
Forge
Victor & Harris Oxy/Act
HydMech 225 cold saw
several grinders
Rigid Chop Saw
4x6 band saw
Never enough clamps
-
03-22-2010, 11:20 PM #13
Hey, you did a good job. And strike issue one as graspability is covered. And with epoxy, there is no splitting force developed, so you're in the clear there too. And as far as having two rails, there's nothing you can do if the owner only wants one!
I never want to make anyone feel bad with my criticism except for the periodic occasion when someone flaunts an obvious disrespect for the codes. It's hard enough keeping up that it's probably impossible to cover every base and run a job at the same time.
That said, the building inspectors are not running a job. They are there to nitpick. But what obviously happens is that when they call out every little detail, they get political pressure from city officials (who believe firmly that inspection is a revenue generator, and not for the safety and welfare of the public) that want to keep the building permit revenue flowing.
I feel sorry for a person who has to worry about being fired for doing their job to the best of their abilities.Equipped with red and blue... and red and green!
80% of failures are from 20% of causes
Never compromise your principles today in the name of furthering them in the future.
"All I ever wanted was an honest week's pay for an honest day's work." -Sgt. Bilko
"We are generally better persuaded by reasons we discover ourselves than by those given to us by others." -Pascal
"Since we cannot know all that there is to be known about anything, we ought to know a little about everything." -Pascal
-
03-23-2010, 05:54 AM #14
Member
- Join Date
- Nov 2009
- Location
- Central Arkansas
- Posts
- 46
Rick
Trying to succeed, Learning by failing
HH210 (Merry Christmas to Me)
HH 140
Hyper Therm Powermax 600
Hobart Stickmate AC/DC
Forge
Victor & Harris Oxy/Act
HydMech 225 cold saw
several grinders
Rigid Chop Saw
4x6 band saw
Never enough clamps



Reply With Quote







