I will see if I can swing by when I pick them up. I went with the Plymouth stort because that's their HQ and where they work on them, and since I had them in the co. van, I figured why not just take them there before work. I'll let you know when I will be getting them, see if I can stop in for a min or 2 to check out your work, sounds like you make some cool stuff![]()
Well, I got the XMT package for about 4k, and a little less for the Dynasty. They have between 1 1/4 and almost 2 years of warranty left on them, and looking at them, they seem almost new. I guess thats a pretty decent deal for them, though not cheap, thats for sure... I will post some pics of my new babies when I get them home from the shop. Now only if I could use them here...![]()
Results 41 to 48 of 48
Thread: Painting Your Tanks?
-
07-17-2007, 06:45 AM #41
Senior Member
- Join Date
- Aug 2006
- Posts
- 307
-
07-17-2007, 07:17 AM #42
Why don't you have power to the new shop yet?
Syncrowave 250DX
Invison 354MP
XR Control and 30A
Airco MED20 feeder
Thermal Dynamics Cutmaster 81
Smith O/A rig
And more machinery than you can shake a 7018 rod at
-
07-17-2007, 07:30 AM #43
I got the XMT package
so its all set up to mig then , cool.
now comes the really hard part, the wait till you can turn them on.
congrats on some great new toy's
thanks for the help
......or..........
hope i helped
feel free to shoot me an e-mail direct i have time to chat.
james@newyorkmetalart.com
summer is here, plant a tree. if you don't have space or time to plant one sponsor some one else to plant one for you. a tree is an investment in our planet, help it out.
JAMES
-
07-17-2007, 12:25 PM #44
Senior Member
- Join Date
- Aug 2006
- Posts
- 307
*sigh* Because we had a baby last Oct, and all work on the shop came to a screeching halt. I started working on it again in late May, but it's been in fits and starts. I have to get the insulation up, since I just got done reinforcing my rafters, so I can hang a beam from the ceiling, to attach a lift to.
That part is now done, so I can start hanging the insulation, get it inspected, then do the sheetrock. Get that inspected, then finish up the electrical inside (no small task, as I have to get the rotary phase converter wired in there correctly, and to finish up all the outlets), and then have NSP hook up the 400 amp service.
THEN I can start welding (and everything else!)
Thanks, just got a call from the shop, everything tested out perfectly except for my push-pull gun, it appears that something had crushed the conduit, and doesn't work well. I am having them do the repair, sounds like it's going to cost about $80 for labor and around $140 for parts.
Oh well, at least this way it will be done correctly, and if I have any issues, it will be my welding, not the way I put the torch together. I am going to have them show me around the units when I pick them up, I might even take a couple classes up there before I pick em up, that way I can learn on my own gear. I'm getting pretty excited about all this, can't wait to get going!
-
07-17-2007, 02:12 PM #45
You want all your wiring done before you insulate unless you're only using hard foam on the interior.
My shop will have foam on the outside of the sheathing, then glass inside. Should work out to a nice sound barrier and keep the heater from working too often.
How did you re-enforce the rafters? How much load are you expecting your beam to handle and how big is the beam? I'm actually building my crane right now - before the walls go up.Syncrowave 250DX
Invison 354MP
XR Control and 30A
Airco MED20 feeder
Thermal Dynamics Cutmaster 81
Smith O/A rig
And more machinery than you can shake a 7018 rod at
-
07-18-2007, 04:01 AM #46
Senior Member
- Join Date
- Aug 2006
- Posts
- 307
well, seeing as how I have completely hijacked this thread
I think I will resurrect the one I started last fall on my workshop. It's over on the Motorsports side, I believe. Sorry, Bert, this one kinda got away from me
-
07-18-2007, 05:42 AM #47
i think the thread had already run its corse.
no painting of tanks without first getting the go from the filler first.
best option is to make a cover for it.
other than that its a risk that could result in a minimum of needing a re-cirt test befor they will fill, that is only $19 here but may very from place to place.
happy welding, hijacking, and painting to all.
thanks for the help
......or..........
hope i helped
feel free to shoot me an e-mail direct i have time to chat.
james@newyorkmetalart.com
summer is here, plant a tree. if you don't have space or time to plant one sponsor some one else to plant one for you. a tree is an investment in our planet, help it out.
JAMES
-
07-19-2007, 12:55 AM #48
alha,
no need to apologize! I find that I'm hijacking a lot of other threads, and I need to stop that!!!
I apologize to all you others also!!!!!!!!!!!!
I'm not late...
I'm just on Hawaiian Time




Reply With Quote







