Here,s a few shots of some railings i built and installed.Nothing really fancy but i thought some here may like to see.They are all twisted 1/2"pickets and1"solid sq post,1/2"x1/8 scrolls and cap moulding.This work is very time consuming and i hate bidding it, i always feel i cut myself short.Anyone else doing railings feel the same?I am very fanatical when building and installing which is probably why i feel i am always over on time.Ok enough of me whinning, lets hear it guys.
![]()
Results 1 to 6 of 6
Thread: Railing job
-
05-04-2008, 05:57 PM #1
Railing job
Last edited by admweld; 05-04-2008 at 07:54 PM.
BB402D
TB300D
DIMENSION652
MM250X
MAXSTAR140
S-32 FEEDER W/1260 IRONMATE FC/GUN
HT/PWR-MAX1250 PLASMA
-
05-04-2008, 06:33 PM #2
Nice job. I hate building railing also. I won't even give quotes anymore and its way too time consuming for me. But i do like how it looks when done...Bob
Bob Wright, Grandson of Tee Nee Boat Trailer Founder
Metal Master Fab Salem, Oh 44460
Birthplace of the Silver & Deming Drill
1999 MM185 w/185 Spoolgun,1986 Thunderbolt AC/DC
-
05-04-2008, 06:36 PM #3
I know what yer talkin' about
I never feel like I get my moneys worth when I make railings but I am always proud of how they turn out.
They just simply do not bring the kind of money they deserve IMO. I have not done one for about 8 years or so now cause I just refuse them. There is better money out there once you get rolling unless you make it your niche'.Miller Dynasty 700...OH YEA BABY!!
MM 350P...PULSE SPRAYIN' MONSTER
Miller Dynasty 200 DX "Blue Lightning"
Miller Bobcat 225 NT
Miller 30-A Spoolgun
Miller WC-115-A
Miller Spectrum 300
Miller Spoolmate 200
Miller 225 Thunderbolt
SPEEDGLAS 9100XX
-
05-04-2008, 07:00 PM #4
It,s not my niche but i don,t like turning down work.I mostly weld heavy equipment. I also use to turn them down when i started 12 yrs ago but in the last 5 years i have been doing more of them.I got $1700 for these four railings and had about $125 in mat. and maybe 22 hrs total including measuring/fab/install and travel time.
Last edited by admweld; 05-04-2008 at 07:55 PM.
BB402D
TB300D
DIMENSION652
MM250X
MAXSTAR140
S-32 FEEDER W/1260 IRONMATE FC/GUN
HT/PWR-MAX1250 PLASMA
-
05-04-2008, 09:17 PM #5
Senior Member
- Join Date
- Dec 2007
- Location
- alabama
- Posts
- 711
I think that was a good profit. Down here in AL that would fech $1,200 tops.
People think wal mart prices and cant comprehend the involved time and labor to build custom railings .XMT 350 cc/cv
XMT 350 vs
TRAILBLAZER 302
MILLER DVI
PASSPORT PLUS
DYNASTY 200 DX
MAXSTAR 150 STL
HOBART CHAMP
HF-251 BOX
12-RC SUITCASES
12-VS SUITCASE
-
05-04-2008, 09:39 PM #6
I agree with fabricator, down here in my area we could never get 70 plus dollars an hour for railings. I just did 28' with a 8' side section and a staircase railing for the same 17 hundred you got. It took about a day and a half to build and a day to paint, customer is a general contractor and was going to have his guys install it to save on the price. All done with 1 1/4" x 14 ga. mild sq. tube for the upper and lower rails and 1/2" x 14 ga. for the rest of it.
Compare yours to mine and tell me who made out better. I still made about 1200 on the job after materials. DaveIf necessity is the Mother of Invention, I must be the Father of Desperation!
John Blewett III 10-22-73 to 8-16-07
Another racing great gone but not to be forgotten.http://video.google.com/videoplay?do...modified&hl=en


They are all twisted 1/2"pickets and1"solid sq post,1/2"x1/8 scrolls and cap moulding.This work is very time consuming and i hate bidding it, i always feel i cut myself short.Anyone else doing railings feel the same?I am very fanatical when building and installing which is probably why i feel i am always over on time.Ok enough of me whinning, lets hear it guys.
Reply With Quote








