    I posted this proposed project a few months back, looking for some beam sizing. I eventually told the client to get the project properly engineered then I would be happy to weld it. As you can see the handrails are not finished yet. The owner wants to finish it off with wood
    The engineer spec'd the posts out as 3" x 3/16" A500 steel. The rest is 4" and 6" A36. The ground level flight of stairs had been acquired by the client. I installed those and added the remainder of the project, which cantelivers over his driveway.





    Miller Syncrowave 200
    Homemade Water Cooler
    130XP MIG
    Spectrum 375
    60 year old Logan Lathe
    Select Machine and Tool Mill
    More stuff than I can keep track of..

  • #2
    More...



    Despite the fact that it appears to be painted in red oxide primer that is the finish coat. Dupont "Country Redwood" in a satin finish. The owner wants to fill the handrail openings with 2" pressure treated wood and asked me to drill the rails so he could screw them in. I passed on doing that, telling him to put a few pieces in place, then call mwe back when he wants it done right. I suggested using some 10 gauge 2" welded wire that looks like this:


    I think he'll be giving me a call soon!
    Miller Syncrowave 200
    Homemade Water Cooler
    130XP MIG
    Spectrum 375
    60 year old Logan Lathe
    Select Machine and Tool Mill
    More stuff than I can keep track of..

    Comment


    • #3
      I almost forgot...

      From his new deck, this is the view today:



      Also he wanted the handrail to go through the rain gutter, since that was where it "fell" in the placement of the stairs:




      Being a pipe welder I had never had the opportunity to do a project like this. It was a good challenge getting everything together, bolting the catwalk to the house, etc. Project was welded with an MM250, XP140, TB302 and my Sync 200.
      And for all those ready to holler about the 4" sphere code requirement, the owner is fully aware of it and plans to address it with his "wood".
      Last edited by nocheepgas; 08-23-2010, 07:26 PM.
      Miller Syncrowave 200
      Homemade Water Cooler
      130XP MIG
      Spectrum 375
      60 year old Logan Lathe
      Select Machine and Tool Mill
      More stuff than I can keep track of..

      Comment


      • #4
        Hi Nocheepgas,
        Great job mate.
        I love the balustrade going through the gutter.

        Ji
        Grip it and Rip it

        Comment


        • #5
          Nice job.

          Too bad your customer couldn't have moved the staircase one foot from the house so that the railing would be outside the gutter. I think that it would have looked better.
          Miller Thunderbolt
          Smith Oxyacetylene Torch
          Miller Dynasty 200DX
          Lincoln SP-250 MIG Welder
          Clausing/Coldchester 15" Lathe
          16" DuAll Saw
          15" Drill Press
          7" x 9" Swivel Head Horizontal Band Saw
          20 Ton Arbor Press
          Bridgeport
          Miller Spectrum 375 Plasma Torch

          Comment


          • #6
            Too bad it no longer meets code with the handrail going through the gutter, nor does it pass the 4" sphere rule. I'd be curious to talk to the engineer or the inspector to find out how that got passed.

            Comment


            • #7
              BTW, my previous post only sounded critical. It looks like you did a great job with the rest of the welding and fab work.

              Comment


              • #8
                WOW!!
                Your work looks great man
                Don't ya just hate it when the customer is spending some pretty good money to do the kind of work you want, but they have always got some STUPID thing you just can't seem to get out of their head??
                Man that seems like a big bunch of over hang on them little posts to just look at it.
                Glad an engineer signed off on that one.
                Got any picks of the "hanging" process? I am also curious about how the top fastens to the building and if there are other fastening methods in between.
                Did you do much on site or was it mainly pre-built in shop?
                If these questions were already asked I'm sory I was just too lazy to go back and re-read, but I love those pics

                www.facebook.com/outbackaluminumwelding
                Miller Dynasty 700...OH YEA BABY!!
                MM 350P...PULSE SPRAYIN' MONSTER
                Miller Dynasty 280 with AC independent expansion card
                Miller Dynasty 200 DX "Blue Lightning"

                Miller Bobcat 225 NT (what I began my present Biz with!)
                Miller 30-A Spoolgun
                Miller WC-115-A
                Miller Spectrum 300
                Miller 225 Thunderbolt (my first machine bought new 1980)
                Miller Digital Elite Titanium 9400

                Comment


                • #9
                  Looks great!
                  Blondie (Owner C & S Automotive)

                  Colt the original point & click interface!

                  Millermatic 35 with spot panel
                  Miller 340A/BP
                  Victor O/A torches
                  Lincoln SP125
                  Too many other tools to list

                  03 Ram 1500
                  78 GS1000
                  82 GL1100 Interstate

                  Comment


                  • #10
                    Originally posted by FusionKing View Post
                    WOW!!
                    Your work looks great man
                    Don't ya just hate it when the customer is spending some pretty good money to do the kind of work you want, but they have always got some STUPID thing you just can't seem to get out of their head??
                    Man that seems like a big bunch of over hang on them little posts to just look at it.
                    Glad an engineer signed off on that one.
                    Got any picks of the "hanging" process? I am also curious about how the top fastens to the building and if there are other fastening methods in between.
                    Did you do much on site or was it mainly pre-built in shop?
                    If these questions were already asked I'm sory I was just too lazy to go back and re-read, but I love those pics
                    Sorry For the Late Response: Been in the Mexican Riveria on a cruise for my 25th anniversary! Gained 13 #'s...

                    Thanks for the compliments. I built the sections at my house and trailered them over to the site. I set the posts and used a laser level to mark the height where the platform section would land and tack welded a piece of angle at each mark, then lowered the platform in place. Talk about level, the platform was .004" off level over 10"! After the platform was in place I attached the lover stair level and measured for the upper level. To tie the upper catwalk into the house I cut back the stucco to the framing members and glued and screwed 2 layers of 3/4" plywood to them to bring the mating surface out square (stucco is never true). The catwalk was then attached with 12, 1/2" x 3" lag screws and caulking placed into any voids between the stucco and the plywood. After the catwalk was in place I could accurately measure the upper stair rise and tied it in in a similar fashion.
                    Miller Syncrowave 200