Announcement

Collapse
No announcement yet.

Stair Railing

Collapse
X
  • Filter
  • Time
  • Show
Clear All
new posts

  • Stair Railing

    This is a stair railing that I completed this week. It is about 10 long. Everyone was very pleased with the results. Scrolls are from King Metals.
    Attached Files
    Rick

    Trying to succeed, Learning by failing
    HH210 (Merry Christmas to Me)
    HH 140
    Hyper Therm Powermax 600
    Hobart Stickmate AC/DC
    Forge
    Victor & Harris Oxy/Act
    HydMech 225 cold saw
    several grinders
    Rigid Chop Saw
    4x6 band saw
    Never enough clamps

  • #2
    Nice work Rick...Bob
    Bob Wright

    Spool Gun conversion. How To Do It. Below.
    http://www.millerwelds.com/resources...php?albumid=48

    Comment


    • #3
      nice

      looks great.

      Are the codes for spacing of pickets different on a railing that goes up the middle of the stairs? How did you mount it to the concrete?
      MnT

      Comment


      • #4
        Looks good.

        Comment


        • #5
          nice job RicK
          Jim
          sigpicJim Young
          www.JimYo.com
          www.youtube.com/jimyo01

          Comment


          • #6
            Originally posted by MNT View Post
            looks great.

            Are the codes for spacing of pickets different on a railing that goes up the middle of the stairs? How did you mount it to the concrete?
            The county passed it and it meets ADA. We matched the existing precast concrete scrolls in the overhead of the entrance. That was a have to for National Historic registry. It had to be mounted with base plates so it could be removed. I would have preferred to core drill.
            Rick

            Trying to succeed, Learning by failing
            HH210 (Merry Christmas to Me)
            HH 140
            Hyper Therm Powermax 600
            Hobart Stickmate AC/DC
            Forge
            Victor & Harris Oxy/Act
            HydMech 225 cold saw
            several grinders
            Rigid Chop Saw
            4x6 band saw
            Never enough clamps

            Comment


            • #7
              It seems like I'm always the resident nit pick. Oh well, here goes. I see 3 issues.

              1: It does not appear that the top rail meets the graspability requirement of IRC/IBC which requires a minimum of 4" section perimeter and a maximum of 6.25" section perimeter (which means you're locked into using 1.25" or 1.5" tubing if you chose square). 1" square tubing has a section perimeter less than 4" due to rounding of the corners. It appears that the top rail is smaller than 1 1/4", but it's hard to tell for sure from the picture.

              2: It looks like the anchors are darn close to the edge of the concrete at the bottom of the stairs, which will lead to splitting. The minimum edge distance for anchors is given in "the concrete code" ACI 318 D.8.3

              D.8.3 — Unless determined in accordance with D.8.4, minimum edge distances for post-installed anchors shall be based on the greater of the minimum cover requirements for reinforcement in 7.7, or the minimum edge distance requirements for the products as determined by tests in accordance with ACI 355.2, and shall not be less than 2.0 times the maximum aggregate size. In the absence of product-specific ACI 355.2 test information, the minimum edge distance shall be taken as not less than:
              Undercut anchors .............................................. 6d
              Torque-controlled anchors ................................. 8d
              Displacement-controlled anchors .................... 10d
              3: I'd make it clear and get something in writing that it's understood that this center handrail does not make these stairs code compliant. A protective railing is required on both sides due to height. Having the building inspector sign off on it provides absolutely no indemnification for you.

              That said, they look great and appear to fit a historic property nicely.

              EDIT:
              Originally posted by ricksidebottom View Post
              The county passed it and it meets ADA.
              I thought about it for a second and thought ADA Accessibility Guidelines require 2 handrails. And in fact, these stairs DO NOT meet ADA Accessibility Guidelines.
              4.9.4* Handrails. Stairways shall have handrails at both sides of all stairs.
              http://www.access-board.gov/adaag/html/adaag.htm
              Last edited by Bodybagger; 03-21-2010, 08:43 PM.

              80% of failures are from 20% of causes
              Never compromise your principles today in the name of furthering them in the future.
              "All I ever wanted was an honest week's pay for an honest day's work." -Sgt. Bilko
              "We are generally better persuaded by reasons we discover ourselves than by those given to us by others." -Pascal
              "Since we cannot know all that there is to be known about anything, we ought to know a little about everything." -Pascal

              Comment


              • #8
                So what is the value or need of a inspection? My understanding is that an official from city or state inspects and past it then it is approved.

                Comment


                • #9
                  The only importance of having the inspector look at anything to the state is to make sure the state gets all the money they are due in fees.

                  Comment


                  • #10
                    Originally posted by smooth72 View Post
                    So what is the value or need of a inspection? My understanding is that an official from city or state inspects and past it then it is approved.
                    --------When we rebuilt my house a couple years ago I had to sign a form for the town that basically said I am responsible for making sure that all codes/regulations are met & that the town & inspectors are not liable for anything they pass that is not up to code. The emphasis of this form was for EPA & wetlands but they just made it to cover everything. So to answer your question the inspectors I have dealt with do the best they can but don't know everything.
                    MM250
                    Trailblazer 250g
                    22a feeder
                    Lincoln ac/dc 225
                    Victor O/A
                    MM200 black face
                    Whitney 30 ton hydraulic punch
                    Lown 1/8x 36" power roller
                    Arco roto-phase model M
                    Vectrax 7x12 band saw
                    Miller spectrum 875
                    30a spoolgun w/wc-24
                    Syncrowave 250
                    RCCS-14

                    Comment


                    • #11
                      Originally posted by walker View Post
                      The only importance of having the inspector look at anything to the state is to make sure the state gets all the money they are due in fees.
                      It's not just the fees as they mostly cover the inpectors, inspections & paperwork but they want to know of any upgrades/improvements so they can raise the taxes on the property. They also try to make sure it is done in a safe manner.
                      MM250
                      Trailblazer 250g
                      22a feeder
                      Lincoln ac/dc 225
                      Victor O/A
                      MM200 black face
                      Whitney 30 ton hydraulic punch
                      Lown 1/8x 36" power roller
                      Arco roto-phase model M
                      Vectrax 7x12 band saw
                      Miller spectrum 875
                      30a spoolgun w/wc-24
                      Syncrowave 250
                      RCCS-14

                      Comment


                      • #12
                        Thanks for the comments everyone, yes Bodybagger, even you!

                        The rails are 1 1/4" sq with 1 9/16" cap rail. From the best we could tell, the avg. aggregate size was about 1/4" for the precast steps. We are 2" +- from the edge and epoxy was put on the anchors. As for the total ADA compliance, the building went with nothing for over 70 years. People are just glad to have something to grab onto.

                        I do my best to do it right, but sometime regs can be confusing has h3ll. I have done work in 3 cities close to me and none have identical regs.
                        Rick

                        Trying to succeed, Learning by failing
                        HH210 (Merry Christmas to Me)
                        HH 140
                        Hyper Therm Powermax 600
                        Hobart Stickmate AC/DC
                        Forge
                        Victor & Harris Oxy/Act
                        HydMech 225 cold saw
                        several grinders
                        Rigid Chop Saw
                        4x6 band saw
                        Never enough clamps

                        Comment


                        • #13
                          Hey, you did a good job. And strike issue one as graspability is covered. And with epoxy, there is no splitting force developed, so you're in the clear there too. And as far as having two rails, there's nothing you can do if the owner only wants one!

                          I never want to make anyone feel bad with my criticism except for the periodic occasion when someone flaunts an obvious disrespect for the codes. It's hard enough keeping up that it's probably impossible to cover every base and run a job at the same time.

                          That said, the building inspectors are not running a job. They are there to nitpick. But what obviously happens is that when they call out every little detail, they get political pressure from city officials (who believe firmly that inspection is a revenue generator, and not for the safety and welfare of the public) that want to keep the building permit revenue flowing.

                          I feel sorry for a person who has to worry about being fired for doing their job to the best of their abilities.

                          80% of failures are from 20% of causes
                          Never compromise your principles today in the name of furthering them in the future.
                          "All I ever wanted was an honest week's pay for an honest day's work." -Sgt. Bilko
                          "We are generally better persuaded by reasons we discover ourselves than by those given to us by others." -Pascal
                          "Since we cannot know all that there is to be known about anything, we ought to know a little about everything." -Pascal

                          Comment


                          • #14
                            Originally posted by Bodybagger View Post
                            I feel sorry for a person who has to worry about being fired for doing their job to the best of their abilities.
                            Ain't that some truth!!!!!!!!!!!!
                            Rick

                            Trying to succeed, Learning by failing
                            HH210 (Merry Christmas to Me)
                            HH 140
                            Hyper Therm Powermax 600
                            Hobart Stickmate AC/DC
                            Forge
                            Victor & Harris Oxy/Act
                            HydMech 225 cold saw
                            several grinders
                            Rigid Chop Saw
                            4x6 band saw
                            Never enough clamps

                            Comment

                            Working...
                            X