Miller Electric

Welding Discussion Forums

Home » Resources » Communities » Welding Discussion Forums

  • If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Announcement

Announcement Module
Collapse
No announcement yet.

bobcat(skid loader bucket)

Page Title Module
Move Remove Collapse
X
Conversation Detail Module
Collapse
  • Filter
  • Time
  • Show
Clear All
new posts

  • bobcat(skid loader bucket)

    Just wondering the skid plate on the bottom of the bucket....not the cutting edge....is that hardened steel?....what would be the best process to repair it with....we have a miller252 mig welder and an old Hobart stick welder here at my work....thanks for your input

  • #2
    I'm assuming your talking about the floor? If you are it is mild steel. Any wear bars underneath are usually just mild also on these buckets. Just replace it with mild steel & you'll be fine. You can use your 252 with mild steel wire, dual shield or inner shield & it will work.

    If you want to put some ar wear strips that will wear better but more money & you can use the same process & wire as above.

    Comment


    • #3
      bobcat(skid loader bucket)

      Thanks MMW....boss decided he wanted me to fill the worn out areas in and just leave it go...got partially done with one side and it looked like crap...plus the 1/8 inch plate on the bottom was so worn down it wasn't an 1/8 in anymore on top of being rusted so I found some flat 1/8 in we had and started cutting out the bad spots and patching them in....should finish up tommorrow ....we don't have much in the way of metal in stock so I scrounge around for whatever I can find

      Comment


      • #4
        You see more and more of this nowadays... I just fixed a 314 bucket.....the floor was so bent in but boss just wanted it "banged out".....well.....to be honest it would've been quicker to just cut the floor and bars out in one piece, cut a 1/2" floor on the plasma table and bend it quick in the brake...instead I spent more time burn the old wear bars off, heating and hammering the floor(with an excavator stick as well) and then the floor was still pretty mangled so the gaps I had to fill were pretty big in spots....this also leads to an old floor that will wear out in the high spots.....but ...like many companies they don't look more than 500 feet down the road....
        Originally posted by kerr74 View Post
        Thanks MMW....boss decided he wanted me to fill the worn out areas in and just leave it go...got partially done with one side and it looked like crap...plus the 1/8 inch plate on the bottom was so worn down it wasn't an 1/8 in anymore on top of being rusted so I found some flat 1/8 in we had and started cutting out the bad spots and patching them in....should finish up tommorrow ....we don't have much in the way of metal in stock so I scrounge around for whatever I can find

        Comment


        • #5
          bobcat(skid loader bucket)

          I finished up Friday....wasn't pretty but it'll get the job done and prolong the bucket life....ended up using 3/16 x3 inch flat stock...made all the cuts and was taking out the bad strip and you think it would come out in one piece...noooo....it was filled in before with weld so needless to say my repair looked like a jigsaw puzzle....not one nice long strip....welds looked nice...boss said just patch around the weld...and not spend time grind the weld out....that would of taken awhile...so I did...it's done and will last a little while longer....total cost I kinda figured up....my pay(200.00)public employee....material around 15.00....but I loved it....got me some weld time

          Comment


          • #6
            Post some pictures of the repair.

            Comment


            • #7
              Originally posted by turbo38t View Post
              You see more and more of this nowadays... I just fixed a 314 bucket.....the floor was so bent in but boss just wanted it "banged out".....well.....to be honest it would've been quicker to just cut the floor and bars out in one piece, cut a 1/2" floor on the plasma table and bend it quick in the brake...instead I spent more time burn the old wear bars off, heating and hammering the floor(with an excavator stick as well) and then the floor was still pretty mangled so the gaps I had to fill were pretty big in spots....this also leads to an old floor that will wear out in the high spots.....but ...like many companies they don't look more than 500 feet down the road....
              Exactly what i was thinking.About quicker to just cut all out and replace.