The Big Blue 350 PipePro, purpose-built for transmission pipeline welding, provides 20 to 400 amps for both DC Stick (325 amps at 100 percent duty cycle) and DC TIG welding, 14 to 40 volts for MIG and Flux Cored welding (350 amps at 100 percent duty cycle) and 12,000 watt peak/10,000 watts continuous auxiliary generator power for running tools on site.
  • Video
  • Photo
  • Photo
  • Photo
  • Photo
  • Photo
  • Video
  • Video
  • Video

The Big Blue 350 PipePro, purpose-built for transmission pipeline welding, provides 20 to 400 amps for both DC Stick (325 amps at 100 percent duty cycle) and DC TIG welding, 14 to 40 volts for MIG and Flux Cored welding (350 amps at 100 percent duty cycle) and 12,000 watt peak/10,000 watts continuous auxiliary generator power for running tools on site. 

The new pipeline stretches 185 miles through Arkansas and Mississippi.  

Sheehan Pipe Line Construction Company, the oldest pipeline contractor in the nation, works on the pipeline just outside of Bald Knob Arkansas –widely considered to be the “Pipeliner’s Capital of the World”.

Carmen Moody, welder, Local Union 798 and Sheehan Pipe Line Construction Company, welds a tie-in on a pipeline just outside of Bald Knob, Arkansas. 

Pipeline welders own and operate their own rigs—engine-driven welder generators are the most critical tool on their truck, both for its welding and power generation capabilities. 

Miller and other industry vendors held a Pipeliners Appreciation Event in June where the Big Blue 350 PipePro was unveiled and demonstrated to attendees. 

The Big Blue 350 PipePro, purpose-built for transmission pipeline welding, provides 20 to 400 amps for both DC Stick (325 amps at 100 percent duty cycle) and DC TIG welding, 14 to 40 volts for MIG and Flux Cored welding (350 amps at 100 percent duty cycle) and 12,000 watt peak/10,000 watts continuous auxiliary generator power for running tools on site.
A brief history of the pipeline industry in Bald Knob, Arkansas.
Miller and other industry vendors held a Pipeliners Appreciation Event in June where the Big Blue 350 PipePro was unveiled and demonstrated to attendees.